t_operv1rev 52011-08-31IEC 60255-1-00 (2.6.13) (1975)
operate time
0112/2///61360_4#AAE923
maximum time between the instant the energising power is applied and the instant the relay completes the specified function
- Used by classes
- 1
Also appears in1#
Entities with the same name in other dictionaries:
- Code
AAE923- Data type
- LEVEL(MAX) OF REAL_MEASURE_TYPE
- Unit
- UAA972 UAA972
All properties23#
- Version
- 1
- Revision
- 5
- Preferred name
- operate time
- Short name
- t_oper
- Definition
- maximum time between the instant the energising power is applied and the instant the relay completes the specified function
- Definition source
- IEC 60255-1-00 (2.6.13) (1975)
- Definition class
- 0112/2///61360_4#AAA001component
- Unit structure
- s
- Drawing reference
- NR3..3.3ES2
- Initial value
- 0112/2///62720#UAA972 UAA972
- Responsible committee
- SC3D
- Publisher
- IEC
- Published in
- IEC 61360-4
- Published in
- NON_DEPENDENT_P_DET
- Status level
- Standard
- Version release date
- 2015-08-17
- Revision release date
- 2011-08-31
- Version initiation date
- 2015-08-17
- Original definition date
- 1996-08-01
- MDC_P001_6
- 0112/2///61360_4#AAE923operate time
- MDC_P022
- LEVEL(MAX) OF REAL_MEASURE_TYPE
- MDC_P025_1
- t_oper}
- MDC_P040
- T07