v1rev 12025-09-30IEC 60947-6-1:2021, 3.4.6
operating transfer time
0112/2///62683#ACE140
time measured from the instant when the transfer conditions are fulfilled to the closing of the main contacts on the other source, with any adjustable time delay set to the minimum value, transfer condition being typically supply deviations and programmed conditions for ATSE or remote control commands for RTSE
property- Code
ACE140- Data type
- REAL_MEASURE_TYPEmeasure
- Unit
- UAA972 UAA972
All properties39#
- Version
- 1
- Revision
- 1
- Preferred name
- operating transfer time
- Definition
- time measured from the instant when the transfer conditions are fulfilled to the closing of the main contacts on the other source, with any adjustable time delay set to the minimum value, transfer condition being typically supply deviations and programmed conditions for ATSE or remote control commands for RTSE
- Definition source
- IEC 60947-6-1:2021, 3.4.6
- Note
- Note 1 to entry: Operating transfer times from source I to source II and from source II to source I can be different, and can vary depending on the monitored supply deviation. Note 2 to entry: Operating transfer time does not apply to MTSE.
- Definition class
- 0112/2///62683#ACC012General technical data
- Unit structure
- s
- Drawing reference
- NR2..2.2
- Initial value
- 0112/2///62720#UAA972 UAA972
- Responsible committee
- IEC/TC 121
- Publisher
- IEC
- Published in
- IEC 62683DB
- Published in
- NON_DEPENDENT_P_DET
- Status level
- Standard
- Version release date
- 2025-10-21
- Revision release date
- 2025-09-30
- Version initiation date
- 2025-09-30
- Original definition date
- 2025-09-30
- Change request ID
- C00175
- C017
- C018
- C019
- MDC_P022
- REAL_MEASURE_TYPE