v2rev 12025-09-30IEC 60947-6-1:2021, 3.4.9
closed transition
0112/2///62683#ACH111
a make before break transfer operation that intentionally makes the load current of a second synchronized source for a short period of time before breaking it from the first source
value term- Enumeration code
ACH111
All properties22#
- Version
- 2
- Revision
- 1
- Preferred name
- closed transition
- Definition
- a make before break transfer operation that intentionally makes the load current of a second synchronized source for a short period of time before breaking it from the first source
- Definition source
- IEC 60947-6-1:2021, 3.4.9
- Responsible committee
- IEC/TC 121
- Publisher
- IEC
- Published in
- IEC 62683DB
- Status level
- Standard
- Version release date
- 2025-09-30
- Revision release date
- 2025-09-30
- Version initiation date
- 2025-09-30
- Original definition date
- 2013-07-19
- Change request ID
- C00175
- C017
- C018
- C019
- MDC_P001_11
- 0112/2///62683#ACH111closed transition
- MDC_P025_1
- CLTR