f_duty-av}v2rev 12024-07-10IEV 444-02-15, modified, added average
average duty factor
0112/2///61360_4#ADA128
average ratio of the duration of energization to the total period in which intermittent or continuous or temporary duty takes place
- Used by classes
- 1
Also appears in1#
Entities with the same name in other dictionaries:
- Code
ADA128- Data type
- LEVEL(NOM) OF REAL_MEASURE_TYPE
- Unit
- UAA000 UAA000
Version history2#
IEC CDD records every published revision of each entity — version number, status, timestamp, and the change request that introduced it. OpenCDD captures the full chain of custody from cdd.iec.ch; the entry marked Current is the one rendered on this page.
All properties27#
- Version
- 2
- Revision
- 1
- Preferred name
- average duty factor
- Synonymous name
- {(average duty cycle,en)}
- Short name
- f_duty-av}
- Definition
- average ratio of the duration of energization to the total period in which intermittent or continuous or temporary duty takes place
- Definition source
- IEV 444-02-15, modified, added average
- Note
- NOTE 1: The duty factor may be expressed as a percentage of the total period. NOTE 2: The factor varies between 0 and 100 %; 100 % indicates that the component is continuously in operation; 50 % indicates that the component is, within a given period, half of that period intermitting in operation. NOTE 3: The value of the factor is normally specified by the user in charge of the process.
- Remark
- replaces AAF436 simultaneity factor
- Definition class
- 0112/2///61360_4#ADA083power loss
- Unit structure
- %
- Drawing reference
- NR2..3.3
- Initial value
- 0112/2///62720#UAA000 UAA000
- Responsible committee
- IEC/SC 3D
- Publisher
- IEC
- Published in
- IEC 61360-4
- Published in
- NON_DEPENDENT_P_DET
- Status level
- Standard
- Version release date
- 2024-07-10
- Revision release date
- 2024-07-10
- Version initiation date
- 2024-07-10
- Change request ID
- C00162
- MDC_P022
- LEVEL(NOM) OF REAL_MEASURE_TYPE
- MDC_P025_1
- f_duty-av}
- MDC_P040
- R71