Absolute performance for actual volume flow
properties characterizing the accuracy of an actual volume flow measurement, expressed in engineering units
Hierarchy#
Ancestors (top) → ABC057 (highlighted) → subclasses and powertype instances. Capped at 12 each; see the full lists in the sections below.
Higher level classes3#
Declared properties15#
equation from which the measured error of a device can be calculated
quality which characterizes the ability of an actual volume flow measuring instrument to provide an indicated value close to a true value of the measurand under reference conditions
largest positive or negative value of error of the average upscale or downscale value at each point of absolute volume flow measurement expressed as an absolute value
absolute error of a flow device measuring actual volume flow under reference conditions, when the input is at the lower range value
@number of accuracies for a subrange of actual volume flow
for an actual volume flow measurement, the maximum positive and negative deviation from the specified characteristic curve observed in testing a device under specified conditions and by a specified procedure
algebraic difference between the extreme values obtained by a number of consecutive measurements of the output over a short period of time for the same value of the input under the same operating conditions, approaching from the same direction, for full range traverses of actual volume flow
equation from which the non-repeatability of a device can be calculated
additional percentage error to be added to the measured error of a measured value
basis for stating an additional error for analog output
ABC699reference to Accuracy for a subrange of actual volume flowCLASS_REFERENCE_TYPE(0112/2///61987#ABC069)reference to block ABC069
reference to block ABC210
ABC911reference to Influence of external quantities expressed for volume flowCLASS_REFERENCE_TYPE(0112/2///61987#ABC281)reference to block ABC281
reference to block ABC324
probability, generally expressed as a percentage, that the true value of a statistically estimated quantity falls within a pre-established interval about the estimated value
Subclasses#
No subclasses
This class is a leaf — no other classes inherit from it.
Metadata#
- Remark
- 15 ABC057.15
- Version
- 1
- Revision
- 2
- Status
- Standard
- Responsible committee
- SC65E – IEC 61987
- Change request
C00004- Dates
- Original: 2013-09-27
- Current version: 2013-09-27
- Current revision: 2014-06-18
Full source data#
Every key from the original .xls export, including multilingual variants, status, publisher, committee, and workbook-specific codes.
Raw properties (26 keys from source .xls) — click to expand
- C002
- C00004
- C016
- Standard
- C017.de
- 0
- C017.fr
- 0
- C018.de
- 2014-12-12
- C018.fr
- 2013-09-27
- C019.de
- Mr. W. Hartmann
- C019.fr
- UTE
- MDC_P001_5
- 0112/2///61987#ABC057
- MDC_P002_1
- 1
- MDC_P002_2
- 2
- MDC_P003_0
- 2018-03-28
- MDC_P003_1
- 2013-09-27
- MDC_P003_2
- 2013-09-27
- MDC_P003_3
- 2014-06-18
- MDC_P004.de
- Leistungsdaten für Betriebsvolumendurchfluss in absoluten Einheiten
- MDC_P004.en
- Absolute performance for actual volume flow
- MDC_P004.fr
- Performance absolue pour le débit volumique réel
- MDC_P006.de
- Merkmale, die die Genauigkeit einer Betriebsvolumendurchflussmessung, ausgedrückt in physikalischen Einheiten, kennzeichnen
- MDC_P006.en
- properties characterizing the accuracy of an actual volume flow measurement, expressed in engineering units
- MDC_P006.fr
- propriétés caractérisant la précision d'une mesure de débit massique réel exprimée en unités techniques
- MDC_P009.en
- 15 ABC057.15
- MDC_P010
- 0112/2///61987#ABV501
- MDC_P011
- ITEM_CLASS
- MDC_P012
- SC65E – IEC 61987
- MDC_P014
- {0112/2///61987#ABB727,0112/2///61987#ABD535,0112/2///61987#ABB728,0112/2///61987#ABB733,0112/2///61987#ABB729,0112/2///61987#ABB768,0112/2///61987#ABB730,0112/2///61987#ABC699,0112/2///61987#ABB519,0112/2///61987#ABB774,0112/2///61987#ABB775,0112/2///61987#ABB776,0112/2///61987#ABC911,0112/2///61987#ABC840,0112/2///61987#ABC954}
Version history2#
IEC CDD records every published revision of each entity — version number, status, timestamp, and the change request that introduced it. OpenCDD captures the full chain of custody from cdd.iec.ch; the entry marked Current is the one rendered on this page.