Skip to content
OpenCDD
t_bridgev2rev 52011-02-15IEC 61810-7 (2.10.4) (1997)

bridging time

0112/2///61360_4#AAR009

For a change-over make-before-break contact of a relay, the minimum time interval during which both contact circuits are closed

Used by classes
1
property

Also appears in1#

Entities with the same name in other dictionaries:

Code
AAR009
Data type
LEVEL(MIN) OF REAL_MEASURE_TYPE
Unit
UAA972 UAA972
Used by classes (1)

Version history4#

  1. Current rev 05
    17 Aug 2015 · 15:40 UTC by BATCH 00000917
    View on cdd.iec.ch ↗
  2. superseded rev 04
    23 Jul 2015 · 11:08 UTC by BATCH 00000907
    ↓ Version JSON
    View on cdd.iec.ch ↗
  3. superseded rev 03
    22 Jul 2015 · 14:21 UTC by BATCH 00000904
    ↓ Version JSON
    View on cdd.iec.ch ↗
  4. superseded rev 02
    27 Apr 2011 · 14:08 UTC by BATCH 00000704
    ↓ Version JSON
    View on cdd.iec.ch ↗

IEC CDD records every published revision of each entity — version number, status, timestamp, and the change request that introduced it. OpenCDD captures the full chain of custody from cdd.iec.ch; the entry marked Current is the one rendered on this page.

All properties23#

Version
2
Revision
5
Preferred name
bridging time
Short name
t_bridge
Definition
For a change-over make-before-break contact of a relay, the minimum time interval during which both contact circuits are closed
Definition source
IEC 61810-7 (2.10.4) (1997)
Unit structure
s
Drawing reference
NR3..3.3ES2
Initial value
0112/2///62720#UAA972 UAA972
Responsible committee
SC3D
Publisher
SC3D
Published in
3D/90/CD
Published in
NON_DEPENDENT_P_DET
Status level
Standard
Version release date
2015-08-17
Revision release date
2011-02-15
Version initiation date
2015-08-17
Original definition date
2001-05-28
MDC_P022
LEVEL(MIN) OF REAL_MEASURE_TYPE
MDC_P025_1
t_bridge}
MDC_P040
T07