v1rev 12019-05-27IEV 192-05-02:2015-02
operating time to first failure of an item
0112/2///61360_4#ADA192
operating time accumulated from the first use until failure
- Used by classes
- 1
- Code
ADA192- Data type
- REAL_MEASURE_TYPEmeasure
- Unit
- UAA525 UAA525
Version history1#
IEC CDD records every published revision of each entity — version number, status, timestamp, and the change request that introduced it. OpenCDD captures the full chain of custody from cdd.iec.ch; the entry marked Current is the one rendered on this page.
Metadata#
- Note
- Note 1 Operating time to first failure is a special case of operating time to failure (IEV 192-05-01). Note 2 In the case of non-repairable items, the operating time to first failure is the operating time to failure (IEV 192-05-01:2015-02
- Source document
- IEV 192-05-02:2015-02
- Version
- 1
- Revision
- 1
- Status
- Standard
- Dates
- Current version: 2019-05-27
- Current revision: 2019-05-27